RRD Engr & Constr, BCA-licensed General Builder, Singapore

Checked twice.Built once.

64% of serious construction injuries in Singapore happen on small jobs like A&A and renovation (MOM, 2025). So on every RRD job, an engineer who works for you, not for us, checks the design before we build. No stop-work. No rework. No surprises.

GB2 licenceBCA, valid to Sep 2028
bizSAFE Level 3WSH Council
Floor slab to façadeone contract, rope access included
Low-angle view of Singapore residential blocks against a blue sky
RRD rope-access technicians repairing a glass facade at Biopolis 6, Singapore
Our rope-access teamBiopolis 6, Singapore, 2024
Background photo: Unsplash
13 m, 20 yrsBuildings above both thresholds need a façade inspection every 7 yearsBCA, since 1 Jan 2022
4,000+buildings a year expected in the first PFI cycleBCA
64%of construction fatal and major injuries in 2025 were on small works such as A&A and renovationMOM WSH Report 2025
28stop-work orders issued by MOM in the first half of 2025MOM
~7,000safety breaches found in 3,000+ MOM inspections, H1 2025MOM
100%tie-off expected for anyone working at heightMOM
2x renta tenant who holds over can be charged double rent at the landlord's optionCivil Law Act s 28(4)
5HDB BTO projects halted when their contractor went into liquidation in 2021HDB, MND
DunlopSingapore kept the classic penalty test for liquidated damagesDenka v Seraya [2020] SGCA 119
S$500kminimum paid-up capital for a limited company licensed to supply PE servicesPEB
13 m, 20 yrsBuildings above both thresholds need a façade inspection every 7 yearsBCA, since 1 Jan 2022
4,000+buildings a year expected in the first PFI cycleBCA
64%of construction fatal and major injuries in 2025 were on small works such as A&A and renovationMOM WSH Report 2025
28stop-work orders issued by MOM in the first half of 2025MOM
~7,000safety breaches found in 3,000+ MOM inspections, H1 2025MOM
100%tie-off expected for anyone working at heightMOM
2x renta tenant who holds over can be charged double rent at the landlord's optionCivil Law Act s 28(4)
5HDB BTO projects halted when their contractor went into liquidation in 2021HDB, MND
DunlopSingapore kept the classic penalty test for liquidated damagesDenka v Seraya [2020] SGCA 119
S$500kminimum paid-up capital for a limited company licensed to supply PE servicesPEB

Why the cheapest quote is rarely the cheapest job

Three ways a job goes wrong.

A lower price is easy to compare. Lateness, missing approvals and unsafe sites are not, until they arrive with their own invoices. Each one has a guide and, where it can be calculated, a tool.

Late.
  • Handback date missed
  • Holding-over charges
  • Deposit held back
  • Two rents at once

A reinstatement that overruns its handback date keeps you liable for the old premises while the new lease has already started. The cost runs daily, and it usually dwarfs the gap between two quotations.

2x rentCivil Law Act s 28(4): a tenant who holds over after the tenancy ends is chargeable, at the landlord's option, with double rent for the period.Late handback calculator
Unapproved.
  • Wall hacked without a permit
  • Found at inspection or sale
  • Regularise or reinstate
  • Fees, fines and delay

Works that needed BCA, SCDF or URA approval and did not get it do not go away. They surface at the next structural inspection, a sale or a new lease, and they are paid for twice: once to build, once to regularise or undo.

s 9Building Control Act: a Qualified Person must notify the Commissioner of Building Control of contraventions they know of.Unauthorised works and regularisation
Unsafe.
  • Fall from height
  • Stop-work order
  • Investigation
  • Whole programme halted

One unsafe subcontractor can stop an entire site. Building owners and occupiers carry duties of their own under the Workplace Safety and Health Act, so the question of who is working at height on your premises is also a question about you.

64%of the construction sector's fatal and major injuries in 2025 happened on smaller-scale works such as A&A and renovation, not on big sites (MOM).Work at height and owner liability

The contractor map

Every contractor wins on something. We chose compliance.

Builders compete on two things: how they price, and how seriously they take approvals and checking. Most of the risk an owner carries comes from where a contractor sits on those two lines. The types below are illustrative, not named firms. Use the six questions to place the quotation you are holding.

The contractor map Horizontal axis: from winning low and recovering through variation orders, to pricing the job properly upfront. Vertical axis: from shortcuts with approvals treated as optional, to compliance first with independent checking. The bottom-left is the highest risk to the owner; the top-right is the lowest. How the job is priced Win low, recover through VOs Price it properly upfront Compliance and checking Approvals optional Independently checked Highest owner risk Lowest owner risk The no-permit fixer The lowball bidder The all-in package The big-project builder RRD You
Illustrative positioning of common contractor types. Not a survey and not a rating of any named firm.

Tap a point on the map

Five ways to win a job

Each type of contractor makes its money in a different place. The question for an owner is where the cost shows up later.

Where does your quotation sit?

Answer for the quote you are holding. Nothing is sent anywhere.

Tick what is true. Your quote appears on the map as "You".

The independent engineer model

Why your engineer should never work for your contractor.

A Professional Engineer's endorsement tells the authorities, on your behalf, that the design is safe and compliant. If the contractor hires and pays that engineer, the work is checked by someone paid by the person who did it. We keep the two apart.

  1. You appoint the engineer.The Professional Engineer's appointment is with you, the owner. The Building Control Act gives that appointment to the developer or owner first; a builder appoints only where the owner has not.
  2. You pay the engineer directly.The engineer invoices you at their own rates. RRD adds no mark-up and takes no fee for the introduction.
  3. You can choose any engineer.We usually work with CVC Engineers because they know how we build. The choice stays yours, and any registered PE can do the job.
  4. Your engineer can stop us.A Qualified Person must tell the Commissioner of Building Control about contraventions they know of. That duty is the point of the arrangement.

Most engineering firms chase large projects. Our partner CVC Engineers also takes the small ones: a mezzanine, an opening in a wall, a signboard, a unit that needs regularising. That is where MOM's figures say most construction injuries now happen.

How the model works
Who works for whom The owner holds two separate contracts: a building contract with RRD and an engineering appointment with an independent Professional Engineer, who endorses plans to and reports contraventions to BCA. There is no fee or reporting line between RRD and the engineer. Building contract Appointed and paid by you No fee, no mark-up, no reporting line Endorses plans, reports breaches You, the ownerhold both contracts RRD, the builderbuilds the approved design Your engineer (PE)designs, checks, endorses BCACommissioner of Building Control

The RRD Field Guide

Read the guide before you read the quotation.

Free guides to Singapore building rules and practice, written from the legislation, the agencies and the case law, with every rule linked to its source. Use them to brief your board, check a quotation or plan a handback.

Browse the Field GuideGlossary of terms

Selected work

Fabs, atriums, façades, homes.

Demanding sites with occupants, the public or production lines around the works. The photos are from RRD's own jobs.

Siltronic Fab Next, RRD worksSiltronic Fab Next, RRD works
Semiconductor, Sep 2023

Siltronic Fab Next

Composite panel defect rectification and spray painting inside a semiconductor facility, with masked and protected work areas to control contamination.

Biopolis 6, RRD worksBiopolis 6, RRD works
Commercial, Apr 2024

Biopolis 6

Rope-access glass cleaning, protection-tape removal, panel defect rectification, water-leak repair and spray painting, without full scaffolding.

Fu Lu Shou Complex, RRD worksFu Lu Shou Complex, RRD works
Commercial, Sep 2023

Fu Lu Shou Complex

Project management of scaffolding and panel installation in the open atrium of a busy shopping complex, with the public moving around the site daily.

All projects and references

GB2General Builder Class 2BCA licence, valid to 24 Sep 2028
CR01Minor construction worksBCA-registered, valid to 1 Nov 2027
bizSAFE 3Safety managementWorkplace Safety and Health Council
SME 500Singapore SME 500 AwardRecognised in 2024

Tell us the scope, the address, and the date it has to be done by.

We survey the site, list the items that could change the cost before you sign, and commit to a programme. RRD is founder-led: you deal with the same person from survey to handover.

Send your project details

Call+65 9348 0216 WhatsAppMessage us on WhatsApp
QR code to WhatsApp RRD on +65 9348 0216On a computer? Scan with your phone's camera to open WhatsApp with a message ready to send.
Emailinfo@rrd.sg