64% of serious construction injuries in Singapore happen on small jobs like A&A and renovation (MOM, 2025). So on every RRD job, an engineer who works for you, not for us, checks the design before we build. No stop-work. No rework. No surprises.
Why the cheapest quote is rarely the cheapest job
Three ways a job goes wrong.
A lower price is easy to compare. Lateness, missing approvals and unsafe sites are not, until they arrive with their own invoices. Each one has a guide and, where it can be calculated, a tool.
- Handback date missed
- Holding-over charges
- Deposit held back
- Two rents at once
A reinstatement that overruns its handback date keeps you liable for the old premises while the new lease has already started. The cost runs daily, and it usually dwarfs the gap between two quotations.
- Wall hacked without a permit
- Found at inspection or sale
- Regularise or reinstate
- Fees, fines and delay
Works that needed BCA, SCDF or URA approval and did not get it do not go away. They surface at the next structural inspection, a sale or a new lease, and they are paid for twice: once to build, once to regularise or undo.
- Fall from height
- Stop-work order
- Investigation
- Whole programme halted
One unsafe subcontractor can stop an entire site. Building owners and occupiers carry duties of their own under the Workplace Safety and Health Act, so the question of who is working at height on your premises is also a question about you.
The contractor map
Every contractor wins on something. We chose compliance.
Builders compete on two things: how they price, and how seriously they take approvals and checking. Most of the risk an owner carries comes from where a contractor sits on those two lines. The types below are illustrative, not named firms. Use the six questions to place the quotation you are holding.
Tap a point on the map
Five ways to win a job
Each type of contractor makes its money in a different place. The question for an owner is where the cost shows up later.
The independent engineer model
Why your engineer should never work for your contractor.
A Professional Engineer's endorsement tells the authorities, on your behalf, that the design is safe and compliant. If the contractor hires and pays that engineer, the work is checked by someone paid by the person who did it. We keep the two apart.
- You appoint the engineer.The Professional Engineer's appointment is with you, the owner. The Building Control Act gives that appointment to the developer or owner first; a builder appoints only where the owner has not.
- You pay the engineer directly.The engineer invoices you at their own rates. RRD adds no mark-up and takes no fee for the introduction.
- You can choose any engineer.We usually work with CVC Engineers because they know how we build. The choice stays yours, and any registered PE can do the job.
- Your engineer can stop us.A Qualified Person must tell the Commissioner of Building Control about contraventions they know of. That duty is the point of the arrangement.
Most engineering firms chase large projects. Our partner CVC Engineers also takes the small ones: a mezzanine, an opening in a wall, a signboard, a unit that needs regularising. That is where MOM's figures say most construction injuries now happen.
How the model worksServices
From the floor slab to the façade.
Most contractors work inside a building or on its face. RRD's licensed team does both, including rope access, so one contract and one programme cover the whole job.

Façade works at height
Panel and cladding rectification, sealant, leaks, painting and glass, by rope access where it suits.

Reinstatement
Planned backwards from the handback date.

Addition and alteration
Approvals planned before the first hack.

Interior fit-out
Commercial, institutional and religious spaces, built to an agreed programme and fire-safety plan.
The RRD Field Guide
Read the guide before you read the quotation.
Free guides to Singapore building rules and practice, written from the legislation, the agencies and the case law, with every rule linked to its source. Use them to brief your board, check a quotation or plan a handback.
Façades and work at height
PFI, PSI, rope access, leaks
- Periodic Façade Inspection (PFI) in Singapore: The Complete Owner's Guide22 min read
- Façade Defect Rectification in Singapore: What Happens After the PFI Report19 min read
- Rope Access vs Scaffolding vs Gondola: Choosing Façade Access in Singapore19 min read
- Façade and Curtain Wall Water Leakage: How to Diagnose and Fix the Root Cause18 min read
- Periodic Structural Inspection (PSI) in Singapore: The Owner's Guide18 min read
Defects and maintenance
Tiles, cracks, leaks, windows, glass
- Popped, Hollow and Debonded Tiles in Singapore: Causes, Safety, Repair and Who Pays19 min read
- Concrete Spalling in Singapore: Causes, Risks, Repair Methods and Who Must Fix It18 min read
- Cracks in Walls, Beams and Ceilings in Singapore: Which Are Structural and When to Worry18 min read
- Flat Roof and Wet-Area Waterproofing in Singapore: Membranes, Ponding, Leak Tracing and Repair19 min read
- Water Seeping From the Unit Above: Inter-Floor Leaks in Singapore Condos, the Law, Testing and Who Pays19 min read
- All 8 guides on this topic
Approvals and compliance
BCA, SCDF, URA, PE endorsement
- A&A and Fit-Out Approvals in Singapore: Who Approves What, and When22 min read
- Hacking Walls and Slabs in Singapore: Structural Elements, PT Slabs and Household Shelters20 min read
- SCDF Fire Safety for Fit-Outs in Singapore: Approvals, Inspections and Common Failures21 min read
- PE Endorsement in Singapore: What It Legally Means and Why Engineer Independence Matters21 min read
- Unauthorised Building Works in Singapore: Penalties, Detection and How to Regularise20 min read
- All 11 guides on this topic
Reinstatement and fit-out
Handback, holding over, programmes
- Office Reinstatement in Singapore: The Complete Guide to Commercial Handback19 min read
- The True Cost of a Late Handback: Holding Over, Double Rent and Mesne Profits in Singapore17 min read
- Commercial Fit-Out Programmes in Singapore: Realistic Timelines and Where Delays Come From17 min read
- How to Choose and Verify a Contractor in Singapore: Licences, Registration, Insurance and Red Flags18 min read
Contracts, cost and delay
LDs, EOT, variations, SOPA
- Cheapest Quote vs Delay Risk: The Economics of Choosing a Contractor in Singapore21 min read
- Liquidated Damages and Extension of Time in Singapore: An Owner's and Contractor's Guide22 min read
- Variation Orders and Provisional Sums: How to Stop Surprise VOs on Singapore Building Works21 min read
- Security of Payment Act (SOPA) Singapore: Progress Payments and Adjudication for Owners and Contractors23 min read
- Defects Liability Period and Retention Money in Singapore: DLP, Maintenance Period, Final Account and Late Defects19 min read
- All 8 guides on this topic
Safety and live sites
Work at height, occupied premises, noise
- Asbestos in Renovation and Strip-Out in Singapore: Surveys, Approved Removal and Owner Duties19 min read
- Demolition and Strip-Out Safety in Singapore: Permits, Structural Stability, Asbestos and Waste20 min read
- Preventing Falling Objects in Singapore: Worksites, Façades and Rope Access19 min read
- Work at Height Law in Singapore: Owner, Occupier and MCST Liability Explained21 min read
- Working in Live Premises: Construction in Occupied Offices, Malls, Fabs, Hospitals and Places of Worship20 min read
- All 6 guides on this topic
Tools
Check it yourself.
Four free tools built on the same research as the guides. Your numbers stay in your browser.
Late handback cost calculator
Work out what each day past the handback date costs you, and the day on which a cheaper reinstatement quote stops being cheaper.
Open the toolApproval navigator
Tick the works you are planning and see which approvals and professionals they usually involve: BCA, SCDF, URA, landlord, LEW, PE.
Open the toolPFI and PSI checker
Enter your building's TOP year and height to see whether it falls under the Periodic Façade Inspection regime and how the cycles run.
Open the toolCheap quote vs delay simulator
Run 10,000 simulated projects to compare a cheaper quote with a higher one, once the risk and cost of delay are priced in.
Open the toolSelected work
Fabs, atriums, façades, homes.
Demanding sites with occupants, the public or production lines around the works. The photos are from RRD's own jobs.


Siltronic Fab Next
Composite panel defect rectification and spray painting inside a semiconductor facility, with masked and protected work areas to control contamination.


Biopolis 6
Rope-access glass cleaning, protection-tape removal, panel defect rectification, water-leak repair and spray painting, without full scaffolding.


Fu Lu Shou Complex
Project management of scaffolding and panel installation in the open atrium of a busy shopping complex, with the public moving around the site daily.
Tell us the scope, the address, and the date it has to be done by.
We survey the site, list the items that could change the cost before you sign, and commit to a programme. RRD is founder-led: you deal with the same person from survey to handover.