PFI and PSI checker

Enter your building's TOP year and height to see whether it falls under the Periodic Façade Inspection regime and how the cycles run.

Your building

Used for the structural inspection (PSI).
Only different if the whole building was redeveloped. Used for the façade inspection (PFI).

Periodic Façade Inspection

-

-years since the last whole-building TOP
-year it passes 20 years

Periodic Structural Inspection

How this works. The checker applies BCA's published scope rules for the Periodic Façade Inspection regime and the cycles for the Periodic Structural Inspection. It cannot see BCA's records for your building. BCA notifies owners when an inspection is due, and the notice from BCA is what counts.

Read more: Periodic Façade Inspection (PFI) in Singapore: The Complete Owner's Guide. Periodic Structural Inspection (PSI) in Singapore: The Owner's Guide. Façade Defect Rectification in Singapore: What Happens After the PFI Report.