Window Safety in Singapore: Owner Duties, Inspections, Rivets and Falling-Window Penalties
In Singapore the owner of a flat is legally responsible for keeping its windows securely fixed. BCA advises checking windows at least once every six months, and casement windows must use type 304 stainless steel rivets, not aluminium. Since 1 October 2025, a window that falls through poor maintenance can lead to a fine of up to S$20,000, 12 months' jail, or both.

A window is one of the few parts of a high-rise building that its occupant moves every day. That is also why it fails. Hinges and stays wear, rivets corrode, safety stoppers go missing during cleaning, and one day a panel pushed a little too hard leaves its frame and falls ten or twenty storeys. In Singapore this happens dozens of times a year. Most incidents injure no one, but BCA has said that every fallen window could cause death or serious injury.3
Singapore law answers the question “whose fault is it?” plainly: the owner of the flat is responsible for keeping its windows securely fixed. Since 1 October 2025, that duty sits in the Building Control Act. The building maintenance provisions of the old Building Maintenance and Strata Management Act were moved into it, and the old Act was renamed the Building (Strata Management) Act.15 The penalty for an unsafe exterior feature, including a window, is now up to S$20,000, 12 months’ jail, or both.89
This guide sets out who is legally responsible in HDB flats, condominiums and commercial strata buildings, what BCA asks owners to check every six months, why aluminium rivets are banned from casement window stays, who may legally work on your windows, what the statistics show, and what to do after an incident. It ends with a checklist you can use on your next Window Safety Day.
35 windows fell from buildings in the first 11 months of 2023, 19 of them casement windows2
The legal framework in one page
Three layers of law govern window safety in Singapore.
- The Building Control Act 1989 (BC Act). It defines “exterior feature” and “person responsible”, sets the duty to keep exterior features securely fixed (s 25H), gives BCA power to issue notices to maintain (s 25E), empowers the Minister to order retrofitting of classes of exterior features (ss 22A–22C), and requires serious incidents to be reported (ss 25B–25C).8
- Subsidiary legislation under the BC Act. The Building Control (Meaning of Exterior Features) Regulations 2021 list what counts as an exterior feature. Windows are first on the list.12 The Building Control (Retrofitting of Casement Windows) Order 2004 requires stainless steel rivets.10 The Building Control Regulations 2003 control who may install windows.11 The Building Control (Reportable Matters) Regulations 2025 set the six-hour reporting rule.13
- The Building (Strata Management) Act 2004 (B(SM)A). For strata developments, it settles which windows belong to the unit and which are common property, and it sets the MCST’s maintenance duty.14
What counts as a “window”
The 2021 Regulations define windows broadly: any window, with or without movable parts, including roof skylights, glass panels, glass bricks, louvres, glazed sashes, glazed doors, translucent sheeting and any other material that lets natural light directly into the building. Grilles and shutters are listed separately as exterior features too.12 So a glazed balcony door, a louvred kitchen window and a bathroom skylight are all covered, not only the classic casement.
Where the rules do not apply
The maintenance provisions (Part 4A, including s 25H) and the retrofitting provisions (Part 3) both exclude two things:8
- exterior features on detached, semi-detached, terrace and linked houses that are not in a strata title plan; and
- exterior features on the lowest level of any building.
A landed homeowner is therefore outside the s 25H offence, though not outside the general law of negligence. A strata landed cluster house is inside it.
Who is legally responsible
The BC Act does not leave responsibility to private agreement. It defines the “person responsible” for each exterior feature.8
| Building type | Window or feature | Person responsible under the BC Act | Notes |
|---|---|---|---|
| HDB flat | Windows, grilles and shutters that are part of the flat | Flat owner, or whoever has daily charge of their maintenance and use | HDB says flat owners and occupants are responsible for window upkeep16 |
| HDB block | Exterior features on common property | The Town Council, or its contractor in charge of maintenance | e.g. common corridor and staircase windows |
| Condominium or strata office | Openable windows on a unit’s exterior wall | Unit owner (subsidiary proprietor) or daily occupier | B(SM)A treats them as part of the lot14 |
| Condominium or strata office | Fixed windows on exterior walls, and windows in common areas | MCST (the owner of the common property) or its managing agent | Unless the strata title plan says otherwise14 |
| Non-strata commercial or industrial building | All exterior features | Owner of the building, or the person in charge of its maintenance | A tenant with daily charge may also qualify |
| Landed house not in a strata plan | Any | Outside Part 4A and Part 3 of the BC Act | General negligence law still applies |
The strata rule for windows
Strata buildings cause the most confusion, so the statutory text is worth knowing. Section 2(9) of the B(SM)A provides that all windows on a lot’s exterior wall that are louvres, casement windows, sliding windows or windows with any movable part are part of the lot, not common property. All other windows on the exterior wall (in practice, fixed panes) are common property, unless the strata title plan describes them otherwise.14
The MCST’s duty under s 29(1)(b) is to properly maintain and keep in good and serviceable repair the common property and “each door, window and other permanent cover over openings in walls” where a side of it is part of the common property.14
The BC Act then aligns safety responsibility with ownership. For a window, grille or shutter that is part of a flat, the person responsible is the flat owner or the person with daily charge of it, and this paragraph takes priority over the general rule for common property.8 In practical terms:
- Your openable windows are yours. Their hinges, stays, rivets, stoppers, angle strips and locks are your responsibility, even though they sit in the building’s façade.
- Fixed façade glazing is usually the MCST’s. That includes many curtain-wall and full-height fixed panels in newer condominiums. Check your strata title plan.
- Mixed assemblies need care. A window wall with fixed lites and an openable sash may split responsibility within one frame. Agree the split in writing with your managing agent before a defect becomes a dispute.
Tenants and occupiers
The BC Act definition extends to “other person who ordinarily has daily charge and control over the maintenance and use” of a window.8 A lease does not erase the owner’s position, but a long-term tenant who controls a unit day to day may also be a person responsible. Owners who let units should state in the tenancy agreement who checks the windows, who calls the contractor, and how access is given.
Penalties and enforcement
The offences
| Offence | Provision | Maximum penalty (current) | In force |
|---|---|---|---|
| Failing to keep an exterior feature (e.g. a window) securely fixed so it will not collapse wholly or partly | BC Act s 25H(1) | S$20,000, 12 months’ jail, or both | 1 Oct 202589 |
| Failing to comply with a BCA notice to maintain | BC Act s 25E(7)–(8) | S$20,000, 12 months’ jail, or both; plus S$250 a day for continuing failure | 1 Oct 20258 |
| Failing to retrofit an exterior feature as required by a retrofitting order (e.g. aluminium rivets) | BC Act s 22B(2) | S$20,000, 12 months’ jail, or both; plus S$1,000 a day for a continuing offence | Text as amended wef 1 Oct 2025820 |
| Retrofitting by an untrained person, or improper retrofitting by the contractor | Retrofitting Order 2004, paras 6–7 | S$5,000, 6 months’ jail, or both | 2004 / 200710 |
| Installing or replacing a window without an Approved Window Contractor or builder and trained installer | BC Regulations 2003, reg 41D(3) | S$5,000, 6 months’ jail, or both | 2004, amended 201311 |
| Failing to notify BCA of a reportable safety incident | BC Act s 25C | S$20,000, 12 months’ jail, or both | 1 Oct 2025813 |
BCA’s media releases between 2018 and 2023 quoted the earlier figures: up to S$10,000 and/or one year’s jail for a window that falls through lack of maintenance, and up to S$5,000 and/or six months’ jail for failing to replace aluminium rivets.26 Those releases predate the October 2025 changes. The current statutory maximum for an unsafe or fallen window is the S$20,000 figure in s 25H.
The presumption that catches owners
Section 25H(2) is the provision owners should read twice. If it is proved that a window (or part of it) has fallen, and that there is damage, deterioration or disrepair not caused by accident or acts of nature (fire, explosion, windstorm, lightning, falling trees, vehicles, earthquake and the like), the court presumes the person responsible failed to keep it securely fixed, unless the owner proves otherwise.8 Corroded rivets and missing stoppers are exactly the kind of deterioration that triggers the presumption.
The two defences
The Act gives the person responsible two ways out:8
- Defective materials or work by someone else (s 25H(3)). It is a defence to prove that the defect was caused by materials or work supplied by another person, for example a contractor who fitted the wrong rivets.
- Reliance on an appointed contractor or managing agent (s 25H(4)). The owner is not guilty if, within 7 days of being served notice of the alleged offence, they give BCA a statutory declaration naming the contractor, managing agent or other person appointed to manage and maintain the window, and satisfy the court that they relied in good faith, after proper inquiry, on that person’s professional advice or services.
The practical lesson: keep the invoice, the contractor’s BCA registration and the completion report for every window job. Without them, the second defence is very hard to run.
Enforcement in numbers
BCA has enforced the window rules steadily. Its year-end releases record the cumulative numbers fined and prosecuted for fallen windows since 2006:
| BCA release | People fined since 2006 | People prosecuted since 2006 |
|---|---|---|
| December 2018 | 342 | 92 |
| December 2019 | 352 | 92 |
| December 2020 | 378 | 92 |
| December 2021 | 388 | 92 |
| December 2023 | 406 | 94 |
Sources: BCA media releases.23456 BCA can also direct owners whose windows are non-compliant, such as those still fitted with aluminium rivets, to engage an Approved Window Contractor to rectify them.7
What the statistics show
BCA publishes fallen-window figures each December, usually for the first 11 months of the year. Every year shown below recorded no injuries.
| Period (first 11 months) | Total fallen windows | Casement | Sliding | Other (e.g. louvre) |
|---|---|---|---|---|
| 2018 | 46 | 23 | 19 | 4 |
| 2019 | 48 | 24 | 19 | 5 |
| 2020 | 49 | 32 | 16 | 1 |
| 2021 | 43 | 22 | 16 | 5 |
| 2023 | 35 | 19 | 15 | 1 |
Sources: BCA media releases, 2018–2023.23456 We could not find a published BCA figure for 2022, 2024 or 2025, so none is shown. In 2018 BCA said fallen windows had averaged about 45 a year over the previous five years.6 In 2021 it also handled 12 further cases of windows that were close to dislodging.3
Three patterns repeat in every release:
- Casement windows are the largest single category each year, and BCA attributes most of them to corroded aluminium rivets that can no longer hold the panel.25
- Sliding windows fall mainly because safety stoppers and angle strips are missing or worn, so the panel leaves its track when someone pushes outward too hard.24
- The numbers are falling but not disappearing. Each case is a panel of aluminium and glass dropping from height onto a void deck, a car park, a walkway or a playground.
Composite scenario: the 1990s casement window and the six-hour clock
A family buys a resale condominium unit built in the mid-1990s. The kitchen has three outward-opening casement windows. The previous owner had a handyman “tighten” a loose sash two years earlier; nobody knows what rivets are in the stays.
On a wet afternoon, a sash detaches as the helper closes it and falls nine storeys onto the visitors’ car park, smashing a windscreen. Because property other than the window was damaged, this is a reportable safety incident: the owner must notify BCA within 6 hours.13 The MCST’s managing agent cordons off the area and asks the owner to arrange an inspection.
BCA’s officers find corroded aluminium rivets at the stays, the defect the Retrofitting Order has targeted since 2004.10 Under s 25H(2) the owner is presumed to have failed in the maintenance duty. The s 25H(4) defence is not available, because the “repair” was done by an unregistered handyman, not an Approved Window Contractor.
Illustrative cost chain: a composition fine or prosecution; the car owner’s repair claim; an Approved Window Contractor to retrofit or replace all three windows; possible BCA direction to check the rest of the unit; and the cost of the managing agent’s time and the cordon. A twice-yearly check and a one-off rivet retrofit would have cost a small fraction of this. None of these figures is from a real case; the sequence is typical.
Aluminium rivets versus stainless steel: why the rule exists
A casement window that opens outward usually hangs on variable geometry stays (often called friction stays): a pair of hinged metal arms at the top and bottom of the sash that let it swing out and hold it open. The arms are joined by small rivets. Every time the window is opened, closed or caught by the wind, those rivets carry the weight of the sash in shear and bending.
Singapore’s climate is hard on small aluminium parts. Constant humidity, rain and coastal salt corrode them, and a corroded rivet loses cross-section until it snaps. When the top and bottom stays are joined by rivets in similar condition, both can fail together and the sash drops free.
What the Retrofitting Order requires
The Building Control (Retrofitting of Casement Windows) Order 2004 (S 599/2004) took effect on 1 October 2004.10 In outline:
- Which windows. Casement windows that are installed on, or form part of, the exterior of any residential building; open outwards; and have aluminium rivets at the variable geometry stays. A casement window is one that opens on hinges, pivots or variable geometry stays.
- Who must act. The person responsible for the window must engage an Approved Window Contractor to retrofit it.
- Deadline. For windows installed before 1 October 2004, the grace period was 12 months from that date. Windows less than five years old on that date could wait until they reached five years. Both deadlines have long since passed.
- What retrofitting means. Replacing all aluminium rivets at the stays with stainless steel rivets of type 304 complying with BS EN 10088 or equivalent, and checking before leaving site that the window is properly and securely retrofitted.
- Who may do it. Only a trained window installer, or a person under a trained installer’s supervision, who is a director, partner, sole proprietor or employee of the Approved Window Contractor engaged.
- Paperwork. The person responsible must submit a completion report to the Commissioner of Building Control. BCA’s current page says Approved Window Contractors complete and sign the relevant form (Form A for private flats, Form B1 for HDB flats) and give it to the owner.1
BCA’s guidance adds that contractors who find casement windows with aluminium rivets should report them to BCA.1
Ageing under a changing climate
BCA’s Guidelines on Periodic Façade Inspection (Version 1.3, September 2026) summarise research by the National University of Singapore on how a changing climate affects façade materials. Metals were generally resilient, but aluminium rivets showed a reduced service life of about 22 years, a reduction of up to 11%. BCA cautions that final assessments must rest on actual defect findings.17 For an owner of a building from the 1990s or early 2000s, the implication is that any aluminium rivet still in service is well into the danger zone.
Rivet comparison
| Property | Aluminium rivets (non-compliant at casement stays) | Type 304 stainless steel rivets (required) |
|---|---|---|
| Legal status at casement window stays on residential buildings | Must be replaced under the 2004 Order | Specified by the Order (BS EN 10088 or equivalent) |
| Main failure mode in Singapore | Corrosion and loss of section leading to shear failure | Far more corrosion-resistant in normal exposure |
| BCA’s finding | Main cause of fallen casement windows | Remedy BCA has required since 2004 |
| Who may fit them | — | Approved Window Contractor, using a trained window installer |
Sources: Retrofitting Order 2004; BCA media releases; BCA PFI Guidelines.10217
Can an owner tell the difference by looking? Not reliably. Rivet heads may be painted, worn or partly hidden in the stay. If you do not know when your casement windows were last retrofitted, and you have no completion report, assume they need checking by an Approved Window Contractor.
Sliding, louvre and other windows
Rivets are a casement problem. Other window types fail differently.
- Sliding windows depend on safety stoppers (small blocks that stop the panel from sliding past its limit and out of the frame) and angle strips (profiles that keep the panel in its track). These parts are often removed during cleaning or renovation and never put back. BCA’s advice is to check they are in place, clean the tracks so the panel slides smoothly, and never force a stuck panel outward.34
- Louvre windows have glass blades held by clips on an operating mechanism. Worn clips and loose blades are the weak point.
- Windows with PVC corner brackets rely on plastic corner pieces that can degrade. BCA’s maintenance infographic covers replacement of damaged PVC corners alongside stoppers and angle strips.1
- Top-hung and pivot windows behave like casements in that the hinge hardware carries the sash. Their fixings deserve the same attention.
Who may work on your windows
Approved Window Contractors and trained installers
The Building Control Regulations 2003 make window work a licensed activity:11
- Reg 41A defines an Approved Window Contractor as a company or firm registered by BCA under regulatory workhead RW01, and a trained window installer as an individual certified by BCA. “Installation” includes repairing, replacing and modifying.
- Reg 41D(1) requires anyone who wants to install a window on any building to engage an Approved Window Contractor or a builder. Where a window is installed in the course of building works, a builder must be engaged (reg 41D(1A)).
- Reg 41D(2)–(2A) allows only a trained window installer, or a person under one’s supervision, employed by that contractor or builder, to install a window that is an exterior feature.
- Reg 41E requires the work to meet the objectives and performance requirements in the Fifth Schedule. The contractor or builder must also submit a completion certification to the Commissioner of Building Control within 14 days of finishing a replacement, modification or safety-barrier reinstatement.
BCA’s current guidance confirms that a builder registered under GB1 or GB2 may also install windows, and points owners to BCA’s list of Approved Window Contractors. HDB owners should use HDB’s own list.1
HDB flats
HDB requires flat owners to engage a BCA Approved Window Contractor listed in HDB’s directory for all window installation and replacement. HDB states that flat owners and occupants are responsible for window upkeep. It does not allow replacement of full-height windows (including 3/4-height and bay windows) except where a damaged frame needs complete replacement.16
Windows that double as safety barriers
Some full-height and 3/4-height windows act as the barrier that stops a person from falling where there is a vertical drop of 1,000 mm or more. BCA treats replacement or reinstatement of such a safety barrier integrated with a window as building works. The owner must engage a Professional Engineer to design it and submit structural plans, unless the owner adopts one of the Standardised Designs in Annex B of BCA’s Approved Document. In that case the work is “insignificant building works”, needing no PE and no plan approval or permit, but it must still be done by an Approved Window Contractor or builder with a trained installer who has completed the specific safety-barrier module.111
Independent engineer's note
Where a full-height window also serves as the safety barrier and the Standardised Designs do not fit, structural plans by a Professional Engineer are needed. The engineer is certifying that the new barrier will stop a person from falling. That judgement should be independent of the contractor who is pricing the glazing. RRD recommends that the owner or MCST appoint and pay the PE directly. RRD’s usual independent engineering partner is CVC Engineers, a Singapore civil and structural PE consultancy; the owner contracts with and pays the engineer, RRD adds no mark-up to engineering fees, and the owner may appoint any PE. See our independent engineer model and PE endorsement explained.
Grilles and safety equipment in strata units
Window grilles are exterior features in their own right.12 In strata developments, s 37A of the B(SM)A lets a subsidiary proprietor install safety equipment, including window grilles or screens and devices that restrict how far a window opens, despite any by-law that prohibits it. The owner must repair any damage caused to common property and install the equipment in a proper manner, in keeping with the building’s appearance.14 Once installed, the grille is the owner’s to maintain. For other changes to windows in a condominium, see our guide to condo renovation and MCST approval.
Inspection: the twice-yearly owner check
BCA and MND ask homeowners to check and maintain windows at least once every six months.27 BCA reinforces this with half-yearly Window Safety Day outreach on 6 June and 12 December.7 The method is three words: check, clean, change.57
Six-monthly window check (6/6 and 12/12)
- Casement windows: open each sash fully and watch the stays. Look for rusty, loose or missing fasteners and rivets, bent arms, or a sash that drops or sags when opened. Clean and lightly oil the joints and moving parts.
- Rivets: if you have no record that the casement rivets were retrofitted to stainless steel, arrange for an Approved Window Contractor to inspect and retrofit them.
- Sliding windows: confirm that the safety stoppers and angle strips are present and firmly in place on every panel. Clean the tracks so the panel slides without force.
- Louvre windows: check that every blade sits firmly in its clips and that the operating handle moves all blades together.
- PVC corner brackets and other fittings: look for cracked or missing corner pieces, perished gaskets and loose handles or locks.
- Grilles: check that the fixings into the wall are tight and not corroded.
- Use: never push a sliding panel outward to free it, and never lean out or hang items from an open sash.
- Record: photograph each window and note the date. Keep the contractor’s name, RW01 registration and completion report for any repair.
- Act: have worn stoppers, angle strips, rivets and other parts changed by an Approved Window Contractor, not by a general handyman.
What a professional inspection adds
An Approved Window Contractor can remove and inspect stays and fixings, identify rivet material, check frame anchorage to the wall, and issue the statutory completion report after retrofitting or replacement. For a condominium or commercial building, the MCST or owner may commission a survey of all openable windows. This works best if it is coordinated with façade access, so that each drop or gondola run serves several purposes. Our guide to rope access, scaffolding and gondolas compares the access options. Any contractor working at a window or on a ledge is working at height, and MOM has reminded owners, Town Councils and MCSTs to hire competent contractors and to cordon off the area below.19 See our guide to work at height law and occupier liability.
How windows fit into the Periodic Façade Inspection
For buildings taller than 13 m and older than 20 years, the Periodic Façade Inspection (PFI) adds a statutory layer. The Competent Person must carry out a full visual inspection and a close-range inspection of at least 10% of each elevation.18 BCA’s PFI Guidelines list typical window defects: dangling window panels, cracked or missing glass, rusty or corroded fixings, and failed screws. They also require the Competent Person to report to BCA any dangling windows spotted during the inspection.17 The PFI does not replace the owner’s own six-monthly check. A seven-year cycle cannot catch a stopper that went missing last month. Check whether your building is in scope with the PFI checker.
After an incident: what to do
If a window falls or is found dangling
- Make the area safe. Keep people away from the area below, and ask building management to cordon it off. Do not try to retrieve a dangling sash yourself from a height.
- Check whether it is reportable. If anyone is injured or killed, or a dislodged window damages other property, the person responsible must notify BCA within 6 hours of becoming aware or reasonably suspecting it.13
- Report. Report by phone to BCA’s specified number or in writing on BCA’s form. Give your name and contact details, the address, the date and approximate time, a description of what happened, which window and where, and any injury or damage.13
- Preserve evidence. Photograph the frame, stays, rivets and fallen parts before anything is removed, and keep the pieces.
- Engage an Approved Window Contractor to make the remaining windows safe and to repair or replace the failed one, with the statutory completion report.
- Gather your records. If BCA serves notice of an alleged offence, you have 7 days to make a statutory declaration naming any contractor or managing agent you relied on.8
- Notify your insurer and, in a strata building, the managing agent, who may need to check whether common-property glazing is affected.
The reporting duty also falls on others who learn of the incident in the course of their work: contractors retrofitting the feature, builders or supervisors of building works, and persons carrying out a façade inspection.8 An Approved Window Contractor who discovers a window that has already partly dislodged may therefore have a reporting duty of their own.
Glass that shatters is a related but different problem. See our guide to tempered glass breakage and glass railings. Windows are also only one class of exterior feature that can fall; air-conditioner brackets, sunshades and planters are covered in air-con brackets and exterior features, and the wider picture is in falling objects prevention.
For MCSTs and managing agents
Even where openable windows belong to the units, a fallen window affects the whole estate: cordons, car-park damage, resident anxiety and BCA attention. MCSTs can reasonably:
- circulate BCA’s six-monthly reminder to all subsidiary proprietors before 6 June and 12 December;
- record which windows in the development are common property (fixed panes, staircase and lobby windows) and include them in the MCST’s own maintenance schedule;
- ask owners carrying out renovations to confirm that window works were done by an Approved Window Contractor, and keep a copy of the completion report on the unit file;
- coordinate window surveys with the PFI and with any façade repainting or façade defect rectification, so that one access set-up serves several scopes; and
- know who will notify BCA, and how, if a window falls from a unit or from common property.
Window leaks are a different maintenance problem, often traced to sealants and drainage rather than hardware; see façade water leakage diagnosis.
How RRD approaches this
RRD carries out façade works at height, including rope access glass cleaning, sealant and panel rectification, under bizSAFE Level 3. Façade works such as those at Biopolis 6 in April 2024 put crews alongside windows that owners rarely see up close. Where a survey finds loose, corroded or dangling window hardware, RRD records it with photographs and reports it to the owner or MCST so that a BCA Approved Window Contractor can rectify it. Where window replacement forms part of an A&A or fit-out scope, the itemised quotation states who will install the windows and who issues the BCA completion certification before the contract is signed.
Key takeaways
- The owner is responsible. For windows that are part of a flat, the BC Act names the flat owner or the person with daily charge. In strata buildings, openable windows are part of the lot; fixed exterior windows are generally common property.
- The law changed on 1 October 2025. Window maintenance duties moved from the old BMSMA into the Building Control Act. The maximum penalty for an unsafe or fallen exterior feature is now S$20,000, 12 months’ jail, or both.
- A fallen window is presumed to be the owner’s failure where there is deterioration not caused by accident or acts of nature. The defences depend on records showing you used a qualified contractor.
- Casement stays need stainless steel rivets. Type 304 stainless steel under BS EN 10088 or equivalent, fitted by an Approved Window Contractor, has been required since 2004.
- Check every six months (6 June and 12 December), and use only BCA Approved Window Contractors (RW01) or GB1/GB2 builders with trained window installers.
- Report within 6 hours if a window injures someone or damages property.
Browse the glossary for terms used in this guide, or see our façade works at height service page.
Questions people ask
Who is responsible if a window falls from my condo unit?
Usually you, the unit owner. Under the Building Control Act, the person responsible for a window that is part of a flat is the flat's owner or whoever ordinarily has daily charge of its maintenance and use. The Building (Strata Management) Act also treats openable windows on a unit's exterior wall (casement, sliding, louvre or any window with moving parts) as part of the lot, not common property. Fixed windows are generally common property, maintained by the MCST, unless the strata title plan says otherwise. Check your strata title plan and by-laws for the windows in your unit.
How often should I check my windows?
BCA and MND advise checking and maintaining windows at least once every six months. BCA runs Window Safety Day reminders on 6 June and 12 December each year. A check takes a few minutes: look at the fasteners and rivets on casement windows, confirm that safety stoppers and angle strips are in place on sliding windows, clean the tracks and joints, and call an Approved Window Contractor for anything worn, loose or corroded.
Do I have to replace aluminium rivets in my casement windows?
Yes, if the window is covered by the Building Control (Retrofitting of Casement Windows) Order 2004. The Order applies to outward-opening casement windows on residential buildings with aluminium rivets at the variable geometry stays. It requires an Approved Window Contractor to replace every such rivet with type 304 stainless steel rivets complying with BS EN 10088 or equivalent. BCA has required this since 2004, and corroded aluminium rivets are the main cause of fallen casement windows in BCA's yearly figures.
What is an Approved Window Contractor?
A company or firm registered with BCA's Contractors Registry under the regulatory workhead RW01. The Building Control Regulations require anyone installing a window to engage an Approved Window Contractor or a builder (BCA's page cites the GB1 or GB2 workhead), and the work must be done by, or under the supervision of, a BCA-certified trained window installer employed by that firm. HDB flat owners must use an Approved Window Contractor listed in HDB's own directory.
What is the penalty if my window falls?
Since 1 October 2025, section 25H of the Building Control Act makes it an offence for the person responsible for an exterior feature, which includes a window, to fail to keep it securely fixed. The maximum is a fine of S$20,000, 12 months' jail, or both. If the window has fallen and there is deterioration not caused by accident or acts of nature, the law presumes the owner failed in this duty unless the owner proves otherwise. BCA's media releases before that change quoted S$10,000 and one year.
Can I just ask a handyman to fix a loose window?
Not for installation or replacement work, and not for rivet retrofitting. Window installation, which the Regulations define to include repairing, replacing and modifying, must be carried out by an Approved Window Contractor or a builder using a trained window installer. Using an unqualified person is itself an offence, and it also weakens a key defence: an owner can avoid liability under section 25H if they show they relied in good faith on a contractor or managing agent appointed to maintain the window.
Do landed houses fall under these window rules?
Mostly not. The Building Control Act excludes exterior features on detached, semi-detached, terrace and linked houses that are not in a strata title plan from both the retrofitting provisions and the maintenance provisions, including section 25H. Exterior features on the lowest level of any building are also excluded. Landed owners still owe a duty of care to people near their homes, and installation of windows still has to follow the Building Control Regulations.
Must a fallen window be reported to BCA?
If someone is injured or killed, or a dislodged window damages other property, yes. Since 1 October 2025, the Building Control (Reportable Matters) Regulations 2025 require the person responsible to notify BCA within 6 hours of becoming aware of, or reasonably suspecting, such an incident. Reports can be made by phone or in writing on BCA's form. Failing to report without reasonable excuse can lead to a fine of up to S$20,000, 12 months' jail, or both.
Sources
20 sources. Official sources are marked dark. Links were checked when this guide was last updated.
- bca.gov.sgBuilding and Construction Authority — “Homeowners can help create a safer living environment with regular window maintenance”, media release, 11 December 2021. https://www1.bca.gov.sg/resources/newsroom/homeowners-can-help-create-a-safer-living-environment-with-regular-window-maintenance/ (accessed Nov 2026) ↩↩↩↩↩
- bca.gov.sgBuilding and Construction Authority — “Well-maintained windows keep your community safe”, media release, 11 December 2020. https://www1.bca.gov.sg/resources/newsroom/well-maintained-windows-keep-your-community-safe/ (accessed Nov 2026) ↩↩↩↩
- bca.gov.sgBuilding and Construction Authority — “Regular window maintenance helps to create a safer community”, media release, 12 December 2019. https://www1.bca.gov.sg/resources/newsroom/regular-window-maintenance-helps-to-create-a-safer-community/ (accessed Nov 2026) ↩↩↩↩
- bca.gov.sgBuilding and Construction Authority — “Make Window Safety your priority”, media release, 12 December 2018. https://www1.bca.gov.sg/resources/newsroom/make-window-safety-your-priority/ (accessed Nov 2026) ↩↩↩↩
- mnd.gov.sgMinistry of National Development — “Written Answer by Ministry of National Development on preventing incidents of falling windows”, 14 January 2019. https://www.mnd.gov.sg/newsroom/parliament-matters/q-as/view/written-answer-by-ministry-of-national-development-on-preventing-incidents-of-falling-windows (accessed Nov 2026) ↩↩↩↩
- sso.agc.gov.sgBuilding Control Act 1989 (2020 Revised Edition, as amended), s 2 (definitions of “exterior feature” and “person responsible”), ss 22A–22C, 25B–25C, 25D–25H. Official text: https://sso.agc.gov.sg/Act/BCA1989 ; text read via archived mirror https://littdb.sfo2.cdn.digitaloceanspaces.com/litt/SG/SSOStatutes/acts/BCA1989.html (accessed Nov 2026) ↩↩↩↩↩↩↩↩↩↩↩↩↩↩
- lawplayer.comLawPlayer — Building Control Act 1989, section 25H “Unsafe exterior feature” (annotated Act 12 of 2020 wef 1 October 2025). https://lawplayer.com/sg/act/BCA1989/25H (accessed Nov 2026) ↩↩
- sso.agc.gov.sgBuilding Control (Retrofitting of Casement Windows) Order 2004 (S 599/2004), as amended by S 479/2007. Official text: https://sso.agc.gov.sg/SL/BCA1989-S599-2004 ; text read via archived mirror https://littdb.sfo2.cdn.digitaloceanspaces.com/litt/SG/SSOStatutes/subsidiary_legislation/BCA1989-S599-2004.html (accessed Nov 2026) ↩↩↩↩↩
- littdb.sfo2.cdn.digitaloceanspaces.comBuilding Control Regulations 2003 (S 666/2003), regs 41A, 41D, 41DA and 41E. Official text on Singapore Statutes Online (sso.agc.gov.sg); text read via archived mirror https://littdb.sfo2.cdn.digitaloceanspaces.com/litt/SG/SSOStatutes/subsidiary_legislation/BCA1989-S666-2003.html (accessed Nov 2026) ↩↩↩↩
- littdb.sfo2.cdn.digitaloceanspaces.comBuilding Control (Meaning of Exterior Features) Regulations 2021 (S 784/2021), reg 2. Text read via archived mirror https://littdb.sfo2.cdn.digitaloceanspaces.com/litt/SG/SSOStatutes/subsidiary_legislation/BCA1989-S784-2021.html (accessed Nov 2026) ↩↩↩
- littdb.sfo2.cdn.digitaloceanspaces.comBuilding Control (Reportable Matters) Regulations 2025 (S 615/2025), regs 6–7 and Second Schedule Part 4, in operation 1 October 2025. Text read via archived mirror https://littdb.sfo2.cdn.digitaloceanspaces.com/litt/SG/SSOStatutes/subsidiary_legislation/BCA1989-S615-2025.html (accessed Nov 2026) ↩↩↩↩↩
- littdb.sfo2.cdn.digitaloceanspaces.comBuilding (Strata Management) Act 2004 (2020 Revised Edition, as amended), ss 2(9), 29(1)(b) and 37A. Official text on Singapore Statutes Online (sso.agc.gov.sg); text read via archived mirror https://littdb.sfo2.cdn.digitaloceanspaces.com/litt/SG/SSOStatutes/acts/BSMA2004.html (accessed Nov 2026) ↩↩↩↩↩↩↩
- mnd.gov.sgMinistry of National Development — “Annex C: Public Consultation on Proposed Amendments to the Building (Strata Management) Act” (March 2026), footnote 1. https://www.mnd.gov.sg/api/media/54dcaae7-c8d9-48fe-adb3-52fad2186b2c (accessed Nov 2026) ↩
- hdb.gov.sgHousing & Development Board — “Renovation Guidelines for Window Works”. https://www.hdb.gov.sg/managing-my-home/renovation-and-maintenance/renovation/renovation-guidelines/window-works (accessed Nov 2026) ↩↩
- isomer-user-content.by.gov.sgBuilding and Construction Authority — “Guidelines on Periodic Façade Inspection”, Version 1.3, September 2026, paras 9.2.6, 9.4 and Annex F. https://isomer-user-content.by.gov.sg/338/51a06852-15e6-4a07-936c-2fa211f8c928/PFI%20Guidelines_V1.3.pdf (accessed Nov 2026) ↩↩↩
- littdb.sfo2.cdn.digitaloceanspaces.comBuilding Control (Periodic Inspection of Buildings and Building Façades) Regulations 2021 (S 785/2021) — close-range inspection of at least 10% of each elevation. Text read via archived mirror https://littdb.sfo2.cdn.digitaloceanspaces.com/litt/SG/SSOStatutes/subsidiary_legislation/BCA1989-S785-2021.html (accessed Nov 2026) ↩
- iac.gov.sgMinistry of Manpower — WSH Circular “Safe Work at Heights at Completed Buildings”, 1 March 2018 (to building owners, Town Councils, MCSTs, window and air-conditioning contractors). https://iac.gov.sg/-/media/mom/documents/safety-health/circulars/2018/circular-20180301-safe-work-at-heights-at-completed-buildings.pdf (accessed Nov 2026) ↩
- lawplayer.comLawPlayer — Building Control Act 1989, section 22B “Duty to retrofit exterior feature”. https://lawplayer.com/sg/act/BCA1989/22B (accessed Nov 2026) ↩
Use this guide in a report, a tender or a by-law briefing. Please link to the page so readers get the current version.


