Who is responsible for providing access for a PFI close-range inspection?

Answer

BCA's PFI FAQ lists providing the necessary access system, such as a suspended working platform or gondola, mobile elevating work platform, scaffold or a combination, among the building owner's responsibilities. The Competent Person plans the method of inspection and must ensure that work-at-height requirements are met and that operators hold the relevant certification.

From the RRD Field Guide, checked against the sources cited in Rope Access vs Scaffolding vs Gondola: Choosing Façade Access in Singapore. General information, not advice for your project.

The fuller picture

Rope access suits scattered, light façade tasks on tall buildings with quick set-up and little ground disruption. Gondolas suit repetitive work along full drops. Scaffolds suit heavy, concentrated or long-duration work on lower elevations. MEWPs suit low-level reach from good ground. All are governed by MOM's Work at Heights and Scaffolds Regulations, with PE design required for anchorages and gondola outriggers.

Read the full guide

More questions on this topic