Do gondolas need a Professional Engineer?

Answer

Yes, for the supports. MOM's January 2025 circular requires all outriggers or other overhead supports for suspended scaffolds to be designed by a PE, installed only by an approved scaffold contractor, and inspected by a PE who issues a Certificate of Inspection. The Authorised Examiner who tests and examines the gondola must not certify any suspended scaffold without a PE design.

From the RRD Field Guide, checked against the sources cited in Rope Access vs Scaffolding vs Gondola: Choosing Façade Access in Singapore. General information, not advice for your project.

The fuller picture

Rope access suits scattered, light façade tasks on tall buildings with quick set-up and little ground disruption. Gondolas suit repetitive work along full drops. Scaffolds suit heavy, concentrated or long-duration work on lower elevations. MEWPs suit low-level reach from good ground. All are governed by MOM's Work at Heights and Scaffolds Regulations, with PE design required for anchorages and gondola outriggers.

Read the full guide

More questions on this topic