Do I need an approved scaffold contractor for a small scaffold?

Answer

Only scaffolds that are excluded need no approved scaffold contractor. These are tower scaffolds, trestle scaffolds, and other scaffolds less than 4 metres high when completed, excluding handrails at the top lift. Suspended scaffolds, hanging scaffolds and scaffolds on cantilever or jib supports are never excluded. Every scaffold, including tower scaffolds, must be inspected by a scaffold supervisor before use.

From the RRD Field Guide, checked against the sources cited in Rope Access vs Scaffolding vs Gondola: Choosing Façade Access in Singapore. General information, not advice for your project.

The fuller picture

Rope access suits scattered, light façade tasks on tall buildings with quick set-up and little ground disruption. Gondolas suit repetitive work along full drops. Scaffolds suit heavy, concentrated or long-duration work on lower elevations. MEWPs suit low-level reach from good ground. All are governed by MOM's Work at Heights and Scaffolds Regulations, with PE design required for anchorages and gondola outriggers.

Read the full guide

More questions on this topic