When is a permit-to-work required for façade work?

Answer

The Work at Heights Regulations require a permit-to-work system for hazardous work at height, meaning work where a person could fall more than 3 metres, in workplaces that are factories under the WSH Act. MOM treats premises where building operations or engineering construction are carried out as factories. The occupier appoints an authorised manager and a work-at-height safety assessor, and no hazardous work at height may start without a permit.

From the RRD Field Guide, checked against the sources cited in Rope Access vs Scaffolding vs Gondola: Choosing Façade Access in Singapore. General information, not advice for your project.

The fuller picture

Rope access suits scattered, light façade tasks on tall buildings with quick set-up and little ground disruption. Gondolas suit repetitive work along full drops. Scaffolds suit heavy, concentrated or long-duration work on lower elevations. MEWPs suit low-level reach from good ground. All are governed by MOM's Work at Heights and Scaffolds Regulations, with PE design required for anchorages and gondola outriggers.

Read the full guide

More questions on this topic