Who must prepare the demolition method statement?

Answer

Where demolition involves removing any column, beam, floor or other load-bearing structure, regulation 72 of the WSH (Construction) Regulations requires the work to follow a method statement prepared by a Professional Engineer, with due regard to the integrity of the remaining structure. For demolition of a building, BCA's permit application must also include a method statement and an impact assessment report on surrounding buildings.

From the RRD Field Guide, checked against the sources cited in Demolition and Strip-Out Safety in Singapore: Permits, Structural Stability, Asbestos and Waste. General information, not advice for your project.

The fuller picture

In Singapore, demolition is high-risk construction work needing a permit-to-work system. Hacking non-load-bearing walls and false ceilings is exempt from BCA plan approval, but removing columns, beams, slabs or load-bearing walls needs approved plans, a BCA permit and a PE's method statement. Older buildings need an asbestos survey first, and debris must go through NEA-licensed collectors.

Read the full guide

More questions on this topic