Can demolition debris go into the building's bins?

Answer

No. NEA classifies renovation waste such as hacked concrete and tiles as industrial waste that must be sent to a licensed recycling facility and not mixed with general waste or recyclables. Construction and renovation debris is collected by NEA-licensed general waste collectors. In 2021 a company director was fined S$18,000 for dumping renovation waste in bins serving other premises.

From the RRD Field Guide, checked against the sources cited in Demolition and Strip-Out Safety in Singapore: Permits, Structural Stability, Asbestos and Waste. General information, not advice for your project.

The fuller picture

In Singapore, demolition is high-risk construction work needing a permit-to-work system. Hacking non-load-bearing walls and false ceilings is exempt from BCA plan approval, but removing columns, beams, slabs or load-bearing walls needs approved plans, a BCA permit and a PE's method statement. Older buildings need an asbestos survey first, and debris must go through NEA-licensed collectors.

Read the full guide

More questions on this topic