Is a strip-out 'demolition work' under the WSH regulations?

Answer

It can be. The WSH (Construction) Regulations define demolition work as work connected with the total or partial dismantling or razing of a building or structure, including removing or dismantling machinery or equipment. Demolition is listed as high-risk construction work, which must be carried out under a permit-to-work issued by the project manager after evaluation by a safety assessor. Many strip-outs fall within that definition.

From the RRD Field Guide, checked against the sources cited in Demolition and Strip-Out Safety in Singapore: Permits, Structural Stability, Asbestos and Waste. General information, not advice for your project.

The fuller picture

In Singapore, demolition is high-risk construction work needing a permit-to-work system. Hacking non-load-bearing walls and false ceilings is exempt from BCA plan approval, but removing columns, beams, slabs or load-bearing walls needs approved plans, a BCA permit and a PE's method statement. Older buildings need an asbestos survey first, and debris must go through NEA-licensed collectors.

Read the full guide

More questions on this topic