Which landed house works need no BCA plan submission?

Answer

Only the items in the First Schedule of the Building Control Regulations. For landed homes these include non-load-bearing boundary walls and gates, awnings within set projections, trellises, certain single-storey shelters, a single-storey lean-to extension with a tile or lighter roof, replacing windows and doors, one-to-one replacement of roof covering without replacing trusses, partitions up to 10 m, timber lofts up to 5 m², and air-conditioning works. URA and other approvals may still apply.

From the RRD Field Guide, checked against the sources cited in Landed House A&A in Singapore: Reconstruction vs A&A, Attics, Extensions and Approvals. General information, not advice for your project.

The fuller picture

In Singapore, landed house works stay A&A only within URA's limits: added floor area up to 50% of the existing approved GFA, and no more than 50% of external walls or structural floor area replaced. Anything larger is lodged as reconstruction or new erection. Extensions, attics and basements need URA planning permission and, where structural, BCA plans and a permit through a Qualified Person.

Read the full guide

More questions on this topic