What is the difference between A&A and reconstruction for a landed house?

Answer

URA's plan lodgment guidance treats works as additions and alterations only if they stay within set limits: added gross floor area of no more than 50% of the existing approved GFA, replacement of no more than 50% of the existing approved external walls, and structural changes to columns, beams and floor slabs of no more than 50% of the existing approved floor area. A proposal that exceeds these limits should be lodged as a new erection or reconstruction, which is assessed against the full set of current guidelines.

From the RRD Field Guide, checked against the sources cited in Landed House A&A in Singapore: Reconstruction vs A&A, Attics, Extensions and Approvals. General information, not advice for your project.

The fuller picture

In Singapore, landed house works stay A&A only within URA's limits: added floor area up to 50% of the existing approved GFA, and no more than 50% of external walls or structural floor area replaced. Anything larger is lodged as reconstruction or new erection. Extensions, attics and basements need URA planning permission and, where structural, BCA plans and a permit through a Qualified Person.

Read the full guide

More questions on this topic