Do I need URA approval to add an attic to my terrace house?

Answer

Generally yes, because an attic adds gross floor area. Since July 2021 URA allows the attic to be proposed flexibly within the permissible two-storey or three-storey envelope, rather than set back behind a 45-degree line. Any accessible roof terrace must sit at least 3 m below the top of the envelope. Your Qualified Person will check whether the attic also takes the house beyond 3 levels, which changes the SCDF position.

From the RRD Field Guide, checked against the sources cited in Landed House A&A in Singapore: Reconstruction vs A&A, Attics, Extensions and Approvals. General information, not advice for your project.

The fuller picture

In Singapore, landed house works stay A&A only within URA's limits: added floor area up to 50% of the existing approved GFA, and no more than 50% of external walls or structural floor area replaced. Anything larger is lodged as reconstruction or new erection. Extensions, attics and basements need URA planning permission and, where structural, BCA plans and a permit through a Qualified Person.

Read the full guide

More questions on this topic