How long does a landed house A&A approval take?

Answer

There is no single clock. URA plan lodgment issues an acknowledgement that stays valid for two years. BCA processes a complete structural plan without an Accredited Checker within 7 working days and a structural works permit within 7 working days. In practice, surveys, design, neighbour coordination and resubmissions take longer than the agency clocks, so allow for several months between first survey and starting structural works on a typical A&A.

From the RRD Field Guide, checked against the sources cited in Landed House A&A in Singapore: Reconstruction vs A&A, Attics, Extensions and Approvals. General information, not advice for your project.

The fuller picture

In Singapore, landed house works stay A&A only within URA's limits: added floor area up to 50% of the existing approved GFA, and no more than 50% of external walls or structural floor area replaced. Anything larger is lodged as reconstruction or new erection. Extensions, attics and basements need URA planning permission and, where structural, BCA plans and a permit through a Qualified Person.

Read the full guide

More questions on this topic