We are replacing aluminium composite cladding panels. Are there fire rules?

Answer

Yes. SCDF's Fire Code requires composite panels used as cladding on external walls to comply with a specific clause on composite panels, and SCDF has stated that such panels must be either non-combustible or certified Class 0. Replacement panels must therefore be checked for fire certification, not only appearance and fit. Ask your Qualified Person whether the replacement needs a fire safety submission.

From the RRD Field Guide, checked against the sources cited in Façade Defect Rectification in Singapore: What Happens After the PFI Report. General information, not advice for your project.

The fuller picture

After BCA accepts a PFI report, the owner must carry out the Competent Person's recommended repairs within the period BCA specifies. Make unsafe areas safe first, then repair by defect type: sealant, cladding, glazing, spalling concrete, corroded fixings, hollow tiles or windows. Structural repairs need plan approval, a permit and PE supervision; completion is certified with photos.

Read the full guide

More questions on this topic