Is it acceptable to just apply new sealant over the old joint?

Answer

Generally not as a permanent repair. New sealant applied over failed, contaminated or debonded sealant often fails at the interface because it never bonds to the substrate. Durable sealant repair normally means removing the old sealant, cleaning and priming the substrate as the sealant manufacturer specifies, and installing new sealant with the correct joint backing. Adhesion can then be checked by testing on installed joints.

From the RRD Field Guide, checked against the sources cited in Façade Defect Rectification in Singapore: What Happens After the PFI Report. General information, not advice for your project.

The fuller picture

After BCA accepts a PFI report, the owner must carry out the Competent Person's recommended repairs within the period BCA specifies. Make unsafe areas safe first, then repair by defect type: sealant, cladding, glazing, spalling concrete, corroded fixings, hollow tiles or windows. Structural repairs need plan approval, a permit and PE supervision; completion is certified with photos.

Read the full guide

More questions on this topic