What material must an air-con bracket be made of?

Answer

BCA states that an air-conditioning unit installed outside, or projecting from, a building must be supported by a stainless steel bracket or a concrete ledge or casing designed for this purpose. The detailed specifications are in the Seventh Schedule of the Building Control Regulations 2003. For HDB flats, the installer may instead follow specifications approved by HDB. When a bracket is badly corroded, BCA's advice is to replace it with a new stainless steel one.

From the RRD Field Guide, checked against the sources cited in Air-Con Brackets, Planter Boxes and Sunshades: An Owner's Guide to Exterior Features in Singapore. General information, not advice for your project.

The fuller picture

In Singapore, the person responsible for an exterior feature, such as an air-con bracket, sunshade or planter, must keep it securely fixed so it cannot fall. Since 1 October 2025, failing to do so can bring a fine of up to S$20,000, 12 months' jail, or both. External air-con units must sit on a stainless steel bracket or a concrete ledge, installed by a BCA-trained installer.

Read the full guide

More questions on this topic