What is the fine for breaching construction noise limits?

Answer

Under the Environmental Protection and Management (Control of Noise at Construction Sites) Regulations, breaching the noise limits, the no-work rule, an NEA notice or a permit condition is an offence punishable by a fine of up to S$40,000, with a further fine of up to S$1,000 for each day the offence continues after conviction. NEA says enforcement is more severe for repeat offences and longer exceedances. Since 1 October 2022, violators of the no-work rule can be required to install video surveillance.

From the RRD Field Guide, checked against the sources cited in Construction Noise and Working Hours in Singapore: NEA Limits, Sunday Rules, Condo and HDB Renovation Hours. General information, not advice for your project.

The fuller picture

NEA limits construction noise near homes within 150 m to 75 dBA (12-hour average) from 7 am to 7 pm, 65 dBA (1-hour) from 7 pm to 10 pm and 55 dBA (1-hour) overnight, with stricter limits near hospitals and schools. Sites within 150 m of homes or hospitals cannot work from 10 pm Saturday to 7 am Monday, or over public holidays, without a permit. Fines reach S$40,000.

Read the full guide

More questions on this topic