Why does spalling come back after repair?
Usually because the repair did not deal with the cause. BCA's PSI guidelines warn that incorrect repair procedures or unsuitable materials let spalling continue to deteriorate unseen under fresh coats of repair. Common faults are not removing all carbonated or contaminated concrete around the bars, not cleaning the steel, using ordinary plaster instead of a repair mortar, and leaving a leak or high humidity untreated.
From the RRD Field Guide, checked against the sources cited in Concrete Spalling in Singapore: Causes, Risks, Repair Methods and Who Must Fix It. General information, not advice for your project.
The fuller picture
Spalling concrete is concrete cover cracking and breaking away because the steel reinforcement inside has corroded, usually after carbonation or chlorides destroy the steel's natural protection. Small patches can be repaired by removing loose concrete, cleaning and priming the steel and patching with polymer-modified mortar. Extensive spalling, beams, columns or cantilevers need a Professional Engineer. Owners repair inside HDB flats; MCSTs repair common property.
More questions on this topic
- What is spalling concrete?
- Is spalling concrete dangerous?
- Can I repair spalling concrete myself?
- Who pays to repair spalling concrete in an HDB flat?
- Who pays to repair spalling concrete in a condominium?
- Does spalling repair need BCA approval?
- How is spalling linked to the Periodic Structural Inspection?