Can I repair spalling concrete myself?

Answer

HDB says owners can repair small areas themselves: remove the spalled concrete, wire-brush the exposed bars, apply two coats of anti-rust paint, apply a bonding agent, patch with polymer-modified cement mortar and repaint. For larger areas HDB advises engaging a contractor promptly. Anything beyond a small patch, or any spalling on structural members other than a ceiling slab, should be assessed by a professional before repair.

From the RRD Field Guide, checked against the sources cited in Concrete Spalling in Singapore: Causes, Risks, Repair Methods and Who Must Fix It. General information, not advice for your project.

The fuller picture

Spalling concrete is concrete cover cracking and breaking away because the steel reinforcement inside has corroded, usually after carbonation or chlorides destroy the steel's natural protection. Small patches can be repaired by removing loose concrete, cleaning and priming the steel and patching with polymer-modified mortar. Extensive spalling, beams, columns or cantilevers need a Professional Engineer. Owners repair inside HDB flats; MCSTs repair common property.

Read the full guide

More questions on this topic