Is spalling concrete dangerous?

Answer

It can be. Pieces of concrete can fall from ceilings, soffits, ledges and façades without warning, and the corrosion behind it reduces the cross-section of the reinforcement. HDB warns that unattended spalling spreads and weakens the building structure. Most ceiling spalling caught early is a minor repair, but extensive spalling, or spalling on beams, columns, cantilevers or façades, should be assessed by a structural engineer and made safe immediately.

From the RRD Field Guide, checked against the sources cited in Concrete Spalling in Singapore: Causes, Risks, Repair Methods and Who Must Fix It. General information, not advice for your project.

The fuller picture

Spalling concrete is concrete cover cracking and breaking away because the steel reinforcement inside has corroded, usually after carbonation or chlorides destroy the steel's natural protection. Small patches can be repaired by removing loose concrete, cleaning and priming the steel and patching with polymer-modified mortar. Extensive spalling, beams, columns or cantilevers need a Professional Engineer. Owners repair inside HDB flats; MCSTs repair common property.

Read the full guide

More questions on this topic