Why does my roof leak only during some storms?

Answer

Intermittent leaks usually point to details that only fail under particular conditions: an outlet that backs up in very heavy rain, a low upturn at a door that floods when water ponds, or wind-driven rain entering a parapet coping or façade joint above the roof line. Singapore's Sumatra squalls bring gusts of 40 to 80 km/h, so record the date, time and wind direction of each leak to help the investigator.

From the RRD Field Guide, checked against the sources cited in Flat Roof and Wet-Area Waterproofing in Singapore: Membranes, Ponding, Leak Tracing and Repair. General information, not advice for your project.

The fuller picture

Most flat-roof and bathroom leaks in Singapore come from failed membrane details, not the open field: upturns, outlets, penetrations and laps. Diagnose before repairing, using a controlled flood (ponding) test, moisture mapping and inspection. The code of practice is SS 637:2018. In strata buildings the roof membrane is common property, so the MCST repairs it.

Read the full guide

More questions on this topic