What rope access rules help prevent falling objects?

Answer

The Work at Heights Regulations require every industrial rope access system to have at least two independent lines, anchorages installed to a professional engineer's design, and inspection by a competent person at the start of every shift, with a register kept for two years. These rules protect the worker. Falling-object controls for the public below come from the general WSH duties and guidance: tethered tools, tool bags, controlled lowering, cordoned drop zones and coordination with building management.

From the RRD Field Guide, checked against the sources cited in Preventing Falling Objects in Singapore: Worksites, Façades and Rope Access. General information, not advice for your project.

The fuller picture

In Singapore, preventing falling objects is a legal duty shared by the occupier, the employer and the principal. On worksites the occupier must provide adequate overhead protection, scaffolds need toe-boards of at least 90 mm and overlay nets, and debris must go down chutes, not over the edge. Breaches carry fines of up to S$50,000 and two years' jail. Owners must also keep exterior features securely fixed.

Read the full guide

More questions on this topic