What does regularisation cost?

Answer

It depends on what was built and whether it complies. The main cost drivers are the as-built survey, intrusive investigation and testing, the engineer's assessment and submissions, any authority fees or pecuniary penalty, strengthening or rectification works, and the business disruption while works are carried out. A simple non-structural item may only need drawings and a submission; an undersized mezzanine may need strengthening or removal. Get the engineer's assessment before pricing remedial works.

From the RRD Field Guide, checked against the sources cited in Unauthorised Building Works in Singapore: Penalties, Detection and How to Regularise. General information, not advice for your project.

The fuller picture

Unauthorised building works are works carried out without a required approval from BCA (plans or structural permit), SCDF (fire safety works) or URA (planning or conservation permission). They can attract fines of up to S$200,000 under each regime. To keep them, the owner appoints a Qualified Person to survey and assess the works and seek retrospective approval; otherwise they must be rectified or removed.

Read the full guide

More questions on this topic