Is scanning the slab enough before coring?

Answer

Scanning reduces the risk but does not remove it. Ground-penetrating radar and electromagnetic cover meters can locate reinforcement, tendons and some services, but readings need interpretation, can be confused by congested reinforcement or metal decking, and tell you nothing about design intent. Scanning should be combined with the structural drawings and a PE's decision on where coring is acceptable. Original plans may not match what was actually built, so investigation on site matters.

From the RRD Field Guide, checked against the sources cited in Hacking Walls and Slabs in Singapore: Structural Elements, PT Slabs and Household Shelters. General information, not advice for your project.

The fuller picture

In Singapore you may remove or open a wall without BCA submission only if it is genuinely non-load-bearing, meaning it carries nothing but its own weight. Openings in reinforced concrete walls, beams, columns or most slabs need a PE's structural plans and a BCA permit before work starts. Household and storey shelters must not be hacked; only limited drilling and finishes are allowed under SCDF's rules.

Read the full guide

More questions on this topic