How do I stop new tiles from popping?

Answer

Follow BCA's good practices: allow screed and render to air cure for at least 7 days and concrete for 28 days before tiling, check substrate moisture, use an adhesive suited to the tile and substrate, achieve full coverage (apply adhesive to both substrate and tile back for large formats), and provide movement joints at the perimeter and in bays, every 5 to 7 m on interior floors and 3.6 to 7 m where exposed to direct sunlight.

From the RRD Field Guide, checked against the sources cited in Popped, Hollow and Debonded Tiles in Singapore: Causes, Safety, Repair and Who Pays. General information, not advice for your project.

The fuller picture

Tiles pop or sound hollow when the bond between tile, adhesive and screed fails, usually from thermal movement without movement joints, poor adhesive coverage, an uncured substrate or age. Indoors, the unit owner generally pays after the developer's 12-month defects period. On façades, falling tiles are a public-safety risk handled through the MCST or owner and BCA's Periodic Façade Inspection.

Read the full guide

More questions on this topic