Who is responsible for a cracked glass balustrade in a condo?

Answer

It depends on whether the balustrade is common property or part of a unit under the strata title plan. External balustrades and glass panels are prescribed exterior features, and the person responsible for an exterior feature must keep it properly maintained and securely fixed. Report a cracked panel to the MCST or managing agent immediately, cordon off the area below, and check the strata plan for responsibility.

From the RRD Field Guide, checked against the sources cited in Tempered Glass Breakage and Glass Railings in Singapore: Nickel Sulphide, Heat-Soak Testing and BCA Barrier Rules. General information, not advice for your project.

The fuller picture

Tempered glass can shatter without impact, months or years after installation, when a tiny nickel sulphide inclusion expands inside the glass. Heat-soak testing to EN 14179-1 reduces but does not eliminate this risk. In Singapore, BCA's acceptable solution requires glass in barriers to be laminated, barriers to be at least 1.0 m high, and tempered glass at height 2.4 m or more to be protected.

Read the full guide

More questions on this topic