How do I monitor a crack?
Mark the crack ends with a pencil line and the date, photograph it with a ruler or crack-width card, and record the widest point. For better data, fix a two-part plastic tell-tale gauge across the crack and read it regularly. A crack that does not change over several months, including through hot and wet seasons, is likely stable; one that keeps opening is active and needs an engineer.
From the RRD Field Guide, checked against the sources cited in Cracks in Walls, Beams and Ceilings in Singapore: Which Are Structural and When to Worry. General information, not advice for your project.
The fuller picture
Most hairline cracks in plaster, paint and at wall-to-beam joints are non-structural, caused by shrinkage and thermal movement. Worry when cracks are wide or widening, diagonal or stepped, tapered, recurring, accompanied by rust stains, sagging or sticking doors, or appear in beams, columns or slabs. Monitor with dated tell-tales and call a Professional Engineer for those signs.
More questions on this topic
- Are hairline cracks in walls normal?
- What crack width is considered structural?
- Which cracks should I worry about?
- Who repairs cracks in a condominium?
- Can I fill cracks myself before selling or renting out?
- Do cracks in a new home fall under the developer's defects liability?
- Does the Periodic Structural Inspection look at cracks?